Skip to main content
#
Schmidt Farm
our facebook page
site map
contact
Cart
return policy
privacy policy
  • Straight Design - First and Last pole should look like this
  • Eye Bolt 6 inches down from top
  • Hop Tensioner connects to eye bolt and cable is pulled through
  • Anchor Cable is Wraped around post and through eye bolt and then connected with Rope Clips.
  • Anchor Cable is then connected to anchor with Hop Tensioner
If you have questions, or would like more information, please leave your name and contact information.

Schmidt Farm
415 County Road 8
Farmington, Ny 14425
Phone: 585-869-9641
Email: sschmidt@schmidthops.com